Quality Assurance
Quality Inspection Process
Plan checks and documentation around the drawing, manufacturing process and order.
01
Pre-Production
Agree the drawing, material documents and inspection requirements.
02
In-Production
Discuss the planned inspection checkpoints and measurements.
03
Final-Production
Confirm report scope, packaging and release requirements.
Plan Quality Checks at Each Stage
Pre-Production
Technical assessment
Technical review and quotation use a 3D design file with supporting 2D drawings where available. The input set also includes material, surface finish, critical dimensions and quantity.
Material Document Requests
Material grade, certificate and traceability requirements belong in the RFQ. Available supplier records must be confirmed for the material and order before purchasing.
In-Production
Inspection Checkpoints
Critical features, datums and production checkpoints define the inspection priorities. The approach must be confirmed for the manufacturing process and part geometry.
In-process quality control
Inspection frequency and records depend on the agreed process and order scope. Critical characteristics, coverage and required checkpoints need confirmation before production.
Final-Production
Inspection Report Scope
Dimensions, tolerances and required records establish the reporting request. Sampling inspection reports are free; full-inspection reports are charged. Coverage and charges are agreed during quotation.
Packaging
Share handling, surface-protection and delivery requirements with your RFQ. Confirm the packaging method for the part geometry and order with the manufacturing plan before dispatch.
Manufacturing locations and agreed project work
LEAD MFG has owned manufacturing entities in Shenzhen and Dongguan. Yinxian VINA is a CNC manufacturing facility in Bac Ninh, Vietnam, controlled by LEAD MFG. Confirm the applicable entity and process for your order.
Share the manufacturing process, material, drawings and inspection needs. The production arrangements, required checks and applicable manufacturing entity should be confirmed for the order during quotation.

Owned
Shenzhen Manufacturing
Owned
Dongguan Manufacturing
CNC Facility
Vietnam CNC Machining
Inspection Requirements
Critical features, tolerances and datums identify the measurement priorities. Any required inspection method, measurement access and report coverage should be agreed for the parts and order during quotation.



Certification Document Requests
If supplier review requires an ISO document, specify the standard and intended use. The applicable manufacturing entity, covered activities and document status must be reviewed before reliance.
Inspection Reports and Document Requests
Report type and coverage are agreed during quotation. Sampling inspection reports are free; full-inspection and FAI reports are charged. Availability of material and compliance documents must also be confirmed.
Appearance Requirements
Cosmetic acceptance depends on visible surfaces, color and texture. The relevant checks are confirmed for the material, process and finish during quotation.
Dimensional Requirements
Drawing callouts identify critical dimensions, tolerances, datums and reference surfaces. Part geometry determines the measurement approach and report coverage to confirm during quotation.
Fit and Functional Requirements
Mating parts, threads and functional features establish fit and test requirements. Those features and required checks need to be identified in the drawings so their scope can be reviewed for the order.
First Article Inspection
First article inspection (FAI) reports are charged. Include the required report format, inspection scope and acceptance criteria in the RFQ for review during quotation.
Material Compliance Requests
RoHS or other material-compliance documents must be requested in the RFQ. Availability and applicable scope need confirmation for the selected material, process and order.
How should I specify quality requirements?
Drawings, material, quantity, critical features and inspection needs form the RFQ. The applicable manufacturing entity and reporting scope must be confirmed before the order is placed.
What do inspection reports cost?
Sampling inspection reports are free. Full-inspection and first article inspection (FAI) reports are charged. Include the required dimensions, report format and coverage in your RFQ so fees can be confirmed.
Do you provide material certifications?
A material-document request identifies the grade, standard and required records during quotation. Availability and scope must be confirmed for the selected material and order.
How is the inspection method agreed?
Dimensions, tolerances and any specified measurement method form the inspection request. Geometry and that request need review before suitable equipment and reporting scope are confirmed.
What happens if a part does not meet specifications?
If a delivered part appears to differ from the agreed drawing, contact us with the part reference, drawing revision, inspection results and photos. Any investigation and proposed resolution must be reviewed for the order.




